- Monitoring the underwater and seabed of Incheon using a marine observation ship as Inha 21
- Investigation on the seafloor topography, erosion and deposition, and changes in the marine environment
in the coastal waters of Incheon and around the route
- Detection of hazards such as waste tires, chunks of concrete, and drums hidden in the Incheon sea
- Project
- Hydraulic Phenomena Survey of Incheon Port (Phase 3)
- Funded by
- Incheon Port Authority
